During a pump capacity test, if the net pressure is correct but the nozzle flow (gpm) is too high, what adjustment should be made?

A Discharge gate must be opened further

B Discharge gate must be closed further

When you’re performing a pump capacity test, you want the nozzle pressure and the nozzle flow to meet the target values. If the net pressure is already right but the nozzle flow (gpm) is too high, the adjustment you make is to reduce the discharge flow without changing the pressure balance. Closing the discharge gate further achieves this: it increases the hydraulic resistance and lowers the amount of water flowing to the nozzle, bringing the GPM down to the desired level. Opening the gate or adding another discharge would raise flow, and altering the throttle could disrupt the already correct pressure.

C Throttle setting must be increased

D Other discharge is opened to reduce flow

Want more questions?

All options are one-time payments.

$12.50

30 day premium pass

All the basics to get you started

  • Ad-free experience
  • View your previous attempt history
  • Mobile app access
  • In-depth explanations
  • 30 day premium pass access
$30.00 $87.50 usd

6 month DELUXE pass (most popular)

Everything with the 30 day premium pass FOR 6 MONTHS! & the ultimate digital PDF study guide (BONUS)

  • Everything included in the premium pass
  • $87.50 usd value for $30.00! You save $57.50!
  • + Access to the ultimate digital PDF study guide
  • + 6 months of premium pass access
  • + Priority support
$12.50 $18.99

Ultimate digital PDF study guide

For those that prefer a more traditional form of learning

  • Available for instant download
  • Available offline
  • Hundreds of practice multiple choice questions
  • Comprehensive content
  • Detailed explanations
Image Description
Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy